BILOXI BAY BRIDGE

After Katrina destroyed the Biloxi Bay bridge, connecting Biloxi to Ocean Springs, Athena, formerly KS Ware and Associates, was selected as part of the design/build team led by GC Constructors and Volkert, Inc. Athena provided Construction Materials Testing and CEI Inspectors for the duration of this three year, $300 million project for Mississippi Department of Transportation. Athena offered a unique solution to the team by mobilizing a self-contained soil, aggregate and concrete testing trailer, with automated data collection, archiving and distribution of results to all stakeholders. At times, Athena personnel on site numbered as many as 10 technicians and professionals.

 
 

INTERESTED IN WORKING WITH US

 
 

 

See More Of Our Work

 
CMTDeanna Burks